US 85 Access Control Plan
In December 1999 the City of Brighton along with 15 other governmental agencies entered into a Intergovernmetal Agreement with the Colorado Department of Transportation (CDOT) by approving the U.S. 85 Access Control Plan for State Highway 85 from I-76 to Weld County Road 80.
The CDOT approved corridor study was completed in 1992 to assess the long-term needs of the corridor and develop a plan of improvments to ensure that the highway will continue to provide the level of transporation service needed by the area. This plan is currently in place and may be viewed by clicking the areas of interest.
- ACP - Table of Contents (829 kb) Access Control Plan - Table of Contents (PDF)
- ACP - Executive Summary pgs i - iv (1487 kb) Access Control Plan Executive Summary pages i-iv (PDF)
- ACP - Figure ES-1 - Corridor Map (451 kb)ES-1 Corridor Map, Access Control Plan (PDF)
- ACP - Section 1.0 - Introduction pgs 1-4 (1327 kb)Access Control Plan - Section 1.0 Introduction pgs 1-5 (PDF)
- ACP - Section 2.0 - Existing Conditions pgs 5-9 (1593 kb)Access Control Plan Section 2.0 - Existing Conditions pgs 5-9 (PDF)
- ACP - Section 2.0 - Figure 3a-3e - Existing Traffic Volumes pgs 10-14 (641 kb)Access Control Plan - Figure 3a-3e - Existing Traffic Volumes pgs 10-14 (PDF)
- ACP - Section 2.3 - Traffic Volume pgs 14-15 (846 kb)Access Control Plan - Section 2.3 - Traffic Volume pgs 14-15 (PDF)
- ACP - Section 2.3 - Figure 4a-4e - Existing Intersection Geometry pgs 17-21 (976 kb)ACP - Figure 4a-4e - Existing Intersection Geometry and Level of Service pgs 17- 21 (PDF)
- ACP - Section 2.3 - Table 1 - Corridor Accidents pg 22-23 (483 kb)ACP Table 1 - corridor accidents pg 22-23 (PDF)
- ACP - Section 2.3 - Figure 6 - High Hazzard Locations pg 24 (162 kb)Access Control Plan - Figure 6 - High Hazzard Locatins pg 24 (PDF)
- ACP - Section 2.3 - Table 2 - High Hazzard Locations pgs 25-26 (678 kb)ACP - Table 2 - High Hazzar Locations pgs 25-26 (PDF)
- ACP - Section 3.0 - Future Conditions pgs 27-28 (535 kb)Access Control Plan Sectin 3.0 - Future Conditions pgs 27-28 (PDF)
- ACP - Section 3.2 - Figure 7 - 2020 Daily Traffic Projections pg 29 (223 kb)2020 Daily Traffi Projectsions Figure (PDF)
- ACP - Section 4.0 - Objectives and Principals pg 30-32 (810 kb)US 85 Access Control Plan - Objectives and Principals pg 30-32 (PDF)
- ACP - Section 5.0 - Plan, Segments, Cost Estimates pgs 30-44 (3212 kb)Access Control Plan Section 5.0 (PDF)
- ACP - Section 5.1 - Figure 8 - U-Turn Template Large Trucks pg 41 (267 kb)Access Control Plan - Figure 8 - U-Turn Template for Large Trucks pg 41 (PDF)
- ACP - Section 5.2 - Plan Segments, Costs Estimates pgs 42-43 (824 kb)ACP Section 5.0 pgs 42-43 (PDF)
- ACP - Section 5.2 - Figure 9 - Alternative Realign Crossroads pg 44 (263 kb)ACP Figure 9 Alternative Realignment for Crossroad Approaches pg 44 (PDF)
- ACP - Section 5.2 - Plan, Segments, Cost Estimates pgs 45-54 (3726 kb)ACP - Section 5.0 pgs 45-54 (PDF)
- ACP - Section 6.0 - Implementation pg 55 (275 kb)Access Control Plan Section 6.0 - Implementation pg 55 (PDF)
- ACP - Exhibit A - I-76 to WCR80 pgs A1-A28 (7930 kb)Access Control Plan - Exhibit A - I-76 to WCR 80 page A1-A28 (PDF)
- ACP - IGA - Exhibit A - pgs 1-3 and A1 - A22 (1415 kb)Access Control Plan - Intergovernmental Agreement including Exhbit A Documents pgs 1-3 and A1-A22 (PDF)
- ACP - Exhibit C - Preliminary Costs pg (1107 kb)Access Control Plan - Exhbit C - Preliminary Costs pgs (PDF)
- Map Figure 1 - U.S.85 from I-76 to 104th Figure (630 kb)Access control Plan U.S.85 I-76 to 104th Avenue, Figure 1 (PDF)
- Map Figure 2 - U.S.85 from 125th to Nomes (609 kb)A2 112th to Nomes (PDF)
- Map Figure 3 - U.S. 85 from E470 to 144th (639 kb)Access Control Plan for E-470 to 144th (PDF)
- Map Figure 4 - U.S.85 - from Brighton - Bromley to Denver Street (627 kb)US 85 - Bromley to Denver Street (PDF)
- Map Figure 5 - U.S. 85 from County Road 2 to County Road 4 (562 kb)US 85 from WCR2 to WCR4, Figure 5 (PDF)
- Map Figure 6 - U.S. 85 from WCR6 to WCR8 (503 kb)US Highway 85 from WCR 6 to WCR 8 (PDF)
- Map Figure 7 - U.S. 85 from SH52 to WCR 14.5 (729 kb)US85 from SH52 to WCR14.5 (PDF)
- Map Figure 8 - U.S. 85 from WCR16 to WCR20 (561 kb)US 85 from WCR 16 to WCR 20 Figure 8 (PDF)
- Map Figure 9 - U.S. 85 from WCR22 to WCR22.5 (561 kb)US85 WCR 22 to WCR 22.5 Figure 9 Access Control Plan (PDF)
- Map Figure 10 - U.S. 85 from WCR 24 to 25.8 (581 kb)US 85 from WCR 24 to WCR 25.8 Figure 10 (PDF)
- Map Figure 11 - U.S. 85 from WCR30 to WCR34 (621 kb)US 85 - Figure 11 - Platteville WCR30 to WCR34 (PDF)
- Map Figure 12 - U.S. 85 from WCR36 to WCR38 (451 kb)US 85 - WCR36 to WCR 38 (PDF)
- Map Figure 13 - U.S. 85 from Gilcrest - WCR29 - WCR31 (647 kb)US85 - Gilcrest WCR29 - WCR31 Figure 13 (PDF)
- Map Figure 14 - U.S. 85 from WCR42 to WCR44 (565 kb)US85 - WCR42 to WCR44, Figure 14 (PDF)
- Map Figure 15 - U.S. 85 from CR46 to CR48 (512 kb)US85 - WCR 46 to WCR48 figure 15 (PDF)
- Map Figure 16 - U.S. 85 from LaSalle - U.S.37 to WCR294 (681 kb)US85 - LaSalle - WCR37 to WCR294 Figure 16 (PDF)
- Map Figure 17 - U.S. 85 from Evans - 42nd to U.S.34 (916 kb)US85 - Evans - 42nd Street to U.S. 34 Gigure 17 (PDF)
- Map Figure 18 - U.S. 85 from Greeley - 22nd St to 5th St (809 kb)US 85 - Greeley - 22nd Street to 5th Street Figure 18, Access Control Plan (PDF)
- Map Figure 19 - U.S. 85 from Greeley - O Street (588 kb)US85 - Greeley - O Street Figure 19, Access Control Plan (PDF)
- Map Figure 20 - U.S. 85 from Lucerne - CR 66 to CR 392 (459 kb)US 85 - Lucerne - CR66 to CR 392, Figure 20, Access Control Plan (PDF)
- Map Figure 21 - U.S. 85 from CR 70 - CR72 (532 kb)US85 - CR70-CR72, Figure 21, Access Control Plan (PDF)
- Map Figure 22 - U.S. 85 from Eaton - Oak Dr to CR37 (656 kb)US 85 - Eaton- Oak Drive to CR37, Figure 22, Access Control Plan (PDF)
- Map Figure 23 - U.S. 85 from CR78 to CR80 (609 kb)US85 - CR78 to CR80, Figure 23, Access Control Plan (PDF)