Inspections
Our team is charged with protecting the health, safety, and welfare of the public by ensuring safe buildings in the community while providing an enjoyable environment for the visitors and citizens of Brighton. We are currently doing inspections as scheduled while taking every necessary precaution to prevent the spread of COVID-19.
Brighton Offers E-Services
The online service allows inspections to be scheduled via an easy online application. Please email a technician at the Building Permit Counter if you would like more information about this service, and/or to register for online services. Already registered? Here is the Quick Link to Brighton's E-Services for scheduling inspections online.
Scheduling an Inspection
To schedule inspection(s), call the City of Brighton Automated inspection line at 303-655-2151. Inspections requested prior to 4:00 pm are scheduled for the following business day; inspections requested after 4:00 pm will be scheduled the 2nd business day. As a courtesy, we try to accommodate morning or afternoon inspection time requests; however, please be prepared for your inspection anytime during normal business hours.
Inspectors cannot enter an occupied home without a person 18 years or older present. In some cases, the inspector may require authorization to enter a yard.
Holidays
Inspections requested prior to 4:00 pm the business day before a holiday will be scheduled the 2nd business day following the holiday.
Observed Holidays:
- Martin Luther King Day
- President's Day
- Memorial Day
- Juneteenth Day
- Independence Day
- Labor Day
- Veterans Day
- Thanksgiving Day
- Day after thanksgiving
- Christmas Eve
- Christmas Day
- New Year's Day
Canceling an Inspection
To cancel an inspection, call 303-655-2017 prior to the scheduled date/time of inspection.
Inspection Requirements
The following is a list of the most common required inspections. The permit holder must call for each inspection and receive written approval from the building inspector before proceeding with the next step of construction. Work required to be inspected must be accessible and exposed.
FOOTING/CAISSON * - (All types, including pilings, drilled piers, and caissons) Request the inspection when all forms, reinforcing steel, hold down straps and bolts are in place, but prior to covering.
FOUNDATION WALLS (FORMS/STEEL) * - (Includes residential basement walls) Request the inspection when all forms, reinforcing steel, hold down straps and bolts are in place, but prior to covering with concrete. Walls over 4’ high should be pre-inspected when one side of the forms and all reinforcing steel are complete. A building permit and inspection(s) are required for retaining walls that are over 4’ in height measured from the bottom of the footing to the top of the wall or retains over 3’ of earth or supports a surcharge or impounds a flammable liquid.
DAMPPROOFING (If below grade) * - Request the inspection prior to backfilling the foundation. Foundation walls that retain earth and enclose interior spaces and floors below grade shall be dampproofed/waterproofed.
PERIMETER DRAIN (If below grade) * - Request the inspection after drainage tiles, gravel or crushed stone drains, perforated pipe, or other approved systems are installed and prior to backfilling.
SEWER SERVICE - Request the inspection when the piping is installed and properly graded and supported, but not covered. The piping shall be supported and bedded-in for its entire length. Sewers with a slope of less than 1/8” per foot shall be designed and certified by an engineer.
WATER SERVICE - Request the inspection when piping is installed, but not covered. The Building Division will inspect site backflow prevention devices when required.
PLUMBING UNDERGROUND (Drain, Waste, & Vent) - Request the inspection when the under floor building drain, horizontal branches and vents are installed and under pressure test, but not covered. The piping shall be supported and bedded-in for its entire length. (A minimum 10’ head is required when testing with water)
PLUMBING UNDERGROUND (Water supply) - Request the inspection when all under floor water piping is installed and under pressure test, but not covered.
ELECTRIC UNDERGROUND - Request the inspection when the conduit or cable is installed, but not covered.
BRACED WALL LINES/SHEAR * - Request the inspection when all exterior sheathing, wall bracing, strapping and hold-downs are complete, but prior to the weather-resistive barrier being installed.
MECHANICAL ROUGH (Heating and Ventilation) - (Includes process piping.) Request the inspection when all rough-in mechanical work is installed, but not covered. (Underground – Request the inspection when ductwork or piping is installed and under test pressure, if applicable, but not covered.)
PLUMBING ROUGH - (Drain, waste, vent and water piping including, when applicable roof drains.) Request the inspection when all rough-in plumbing is installed and under test, but not covered.
GAS PIPING - Before any system of piping is put in service or concealed, it shall be tested to ensure that it is gas tight. The test pressure to be used shall be no less than 1 1/2 times the proposed maximum working pressure.
ELECTRICAL ROUGH - Request the inspection when all rough-in electrical/conduit is installed, but not covered.
FRAMING - Request the inspection when the building is “dried in” and all framing members, gussets, shear panels, windows, anchors and all plumbing, mechanical and electrical rough-ins are in place, but prior to being covered.
INSULATION - Request the inspection when required insulation, including duct work, RC channel, etc. is complete per the approved assembly, but prior to installation of the wallboard.
LATH INSPECTION - Request the inspection when all substrate, wire lath, and trim are installed, but prior to covering with stucco.
DRYWALL - Request the inspection when the wallboard is installed and nailed/screwed, but prior to fastener or joint treatment.
ABOVE CEILING (Commercial Building) - Request the inspection when all framing, mechanical, electrical, and plumbing are complete, but prior to ceiling tile being installed.
DEMOLITION (Building, Mechanical, Electrical or Plumbing) - Request this inspection after demolition is complete. Plumbing that is capped off shall be inspected prior to covering. Building sewer and water lines shall be capped within 5 feet of the property line and inspected prior to covering.
FINAL INSPECTION - Request the inspection when the building is completed to the requirements of the approved plans, specifications and the City of Brighton Codes.
REROOF - (See roofing policy for complete details) - Request the inspection after all work has been completed.
MID-ROOF (Commercial Buildings) - Request the inspection once the underlayment, flashings, battens (if applicable), and insulation board (if applicable) have been installed, but prior to the placement of any shingles, tiles, or other final roof coverings.
* Indicates a Special Inspection may be required.
More Information
For more information, please call 303-655-2017 or email the Building Permit Counter..
Contact Us
Building Permit Counter:
1stop@brightonco.gov
(303) 655-2017
Inspection Line:
(303) 655-2151
Contact Us
Building Permit Counter:
1stop@brightonco.gov
(303) 655-2017
Homeowner Inspection Line:
(303) 655-2151