US 85 Access Control Plan

In December 1999 the City of Brighton along with 15 other governmental agencies entered into a Intergovernmetal Agreement with the Colorado Department of Transportation (CDOT) by approving the US 85 Access Control Plan for State Highway 85 from I-76 to Weld County Road 80.
 
The CDOT approved  corridor study was completed in 1992 to assess the long-term needs of the corridor and develop a plan of improvments to ensure that the highway will continue to provide the level of transporation service needed by the area.  This plan is currently in place and may be viewed by clicking the areas of interest.  

 ACP - Table of Contents (829 kb)
Access Control Plan - Table of Contents 

 
 ACP - Executive Summary pgs i - iv (1487 kb)
Access Control Plan Executive Summary pages i-iv 

 
 ACP - Figure ES-1 - Corridor Map (451 kb)
ES-1 Corridor Map, Access Control Plan 

 
 ACP - Section 1.0 - Introduction pgs 1-4 (1327 kb)
Access Control Plan - Section 1.0 Introduction pgs 1-5 

 
 ACP - Section 2.0 - Existing Conditions pgs 5-9 (1593 kb)
Access Control Plan Section 2.0 - Existing Conditions pgs 5-9 

 
 ACP - Section 2.0 - Figure 3a-3e - Existing Traffic Volumes pgs 10-14 (641 kb)
Access Control Plan - Figure 3a-3e - Existing Traffic Volumes pgs 10-14 
 

 ACP - Section 2.3 - Traffic Volume pgs 14-15 (846 kb)
Access Control Plan - Section 2.3 - Traffic Volume pgs 14-15 

 
 ACP - Section 2.3 - Figure 4a-4e - Existing Intersection Geometry pgs 17-21 (976 kb)
ACP - Figure 4a-4e - Existing Intersection Geometry and Level of Service pgs 17- 21 
 

 ACP - Section 2.3 - Table 1 - Corridor Accidents pg 22-23 (483 kb)
ACP Table 1 - corridor accidents pg 22-23 
 

 ACP - Section 2.3 - Figure 6 - High Hazzard Locations pg 24 (162 kb)
Access Control Plan - Figure 6 - High Hazzard Locatins pg 24 

 
 ACP - Section 2.3 - Table 2 - High Hazzard Locations pgs 25-26 (678 kb)
ACP - Table 2 - High Hazzar Locations pgs 25-26 

 
 ACP - Section 3.0 - Future Conditions pgs 27-28 (535 kb)
Access Control Plan Sectin 3.0 - Future Conditions pgs 27-28 

 
 ACP - Section 3.2 - Figure 7 - 2020 Daily Traffic Projections pg 29 (223 kb)
2020 Daily Traffi Projectsions Figure  

 
 ACP - Section 4.0 - Objectives & Principals pg 30-32 (810 kb)
US 85 Access Control Plan - Objectives & Principals pg 30-32 

 
 ACP - Section 5.0 - Plan, Segments, Cost Estimates pgs 30-44 (3212 kb)
Access Control Plan Section 5.0 

 
 ACP - Section 5.1 - Figure 8 - U-Turn Template Large Trucks pg 41 (267 kb)
Access Control Plan - Figure 8 - U-Turn Template for Large Trucks pg 41 

 
 ACP - Section 5.2 - Plan Segments, Costs Estimates pgs 42-43 (824 kb)
ACP Section 5.0 pgs 42-43 

 
 ACP - Section 5.2 - Figure 9 - Alternative Realign Crossroads pg 44 (263 kb)
ACP Figure 9 Alternative Realignment for Crossroad Approaches pg 44 

 
ACP - Section 5.2 - Plan, Segments, Cost Estimates pgs 45-54 (3726 kb)
ACP - Section 5.0 pgs 45-54 

 
ACP - Section 6.0 - Implementation pg 55 (275 kb)
Access Control Plan Section 6.0 - Implementation pg 55 
 

ACP - Exhibit A - I-76 to WCR80 pgs A1-A28 (7930 kb)
Access Control Plan - Exhibit A - I-76 to WCR 80 page A1-A28 

 
ACP - IGA - Exhibit A - pgs 1-3 & A1 - A22 (1415 kb)
Access Control Plan - Intergovernmental Agreement including Exhbit A Documents pgs 1-3 & A1-A22 

 
ACP - Exhibit C - Preliminary Costs pg (1107 kb)
Access Control Plan - Exhbit C - Preliminary Costs pgs 

 
Map Figure 1 - US85 from I-76 to 104th Figure (630 kb)
Access control Plan US85 I-76 to 104th Ave, Figure 1 

 
Map Figure 2 - US85 from 125th to Nomes (609 kb)
A2 112th to Nomes 

 
Map Figure 3 - US 85 from E470 to 144th (639 kb)
Access Control Plan for E-470 to 144th 

 
Map Figure 4 - US85 - from Brighton - Bromley to Denver Street (627 kb)
US 85 - Bromley to Denver Street 

 
Map Figure 5 - US 85 from County Rd 2 to County Rd 4 (562 kb)
US 85 from WCR2 to WCR4, Figure 5 

 
Map Figure 6 - US 85 from WCR6 to WCR8 (503 kb)
US Highway 85 from WCR 6 to WCR 8 

 
Map Figure 7 - US 85 from SH52 to WCR 14.5 (729 kb)
US85 from SH52 to WCR14.5  

 
Map Figure 8 - US 85 from WCR16 to WCR20 (561 kb)
US 85 from WCR 16 to WCR 20 Figure 8 

 
Map Figure 9 - US 85 from WCR22 to WCR22.5 (561 kb)
US85 WCR 22 to WCR 22.5 Figure 9 Access Control Plan 

 
Map Figure 10 - US 85 from WCR 24 to 25.8 (581 kb)
US 85 from WCR 24 to WCR 25.8 Figure 10 

 
Map Figure 11 - US 85 from WCR30 to WCR34 (621 kb)
US 85 - Figure 11 - Platteville WCR30 to WCR34 

 
Map Figure 12 - US 85 from WCR36 to WCR38 (451 kb)
US 85 - WCR36 to WCR 38 

 
Map Figure 13 - US 85 from Gilcrest - WCR29 - WCR31 (647 kb)
US85 - Gilcrest WCR29 - WCR31 Figure 13 

 
Map Figure 14 - US 85 from WCR42 to WCR44 (565 kb)
US85 - WCR42 to WCR44, Figure 14 

 
Map Figure 15 - US 85 from CR46 to CR48 (512 kb)
US85 - WCR 46 to WCR48 figure 15 

 
Map Figure 16 - US 85 from LaSalle - US37 to WCR294 (681 kb)
US85 - LaSalle - WCR37 to WCR294 Figure 16 

 
Map Figure 17 - US 85 from Evans - 42nd to US34 (916 kb)
US85 - Evans - 42nd Street to US 34 Gigure 17 

Map Figure 18 - US 85 from Greeley - 22nd St to 5th St (809 kb)
US 85 - Greeley - 22nd Street to 5th Street Figure 18, Access Control Plan 

 
Map Figure 19 - US 85 from Greeley - O Street (588 kb)
US85 - Greeley - O Street Figure 19, Access Control Plan 

 
Map Figure 20 - US 85 from Lucerne - CR 66 to CR 392 (459 kb)
US 85 - Lucerne - CR66 to CR 392, Figure 20, Access Control Plan 

 
Map Figure 21 - US 85 from CR 70 - CR72 (532 kb)
US85 - CR70-CR72, Figure 21, Access Control Plan 

 
Map Figure 22 - US 85 from Eaton - Oak Dr to CR37 (656 kb)
US 85 - Eaton- Oak Drive to CR37, Figure 22, Access Control Plan 

 
Map Figure 23 - US 85 from CR78 to CR80 (609 kb)
US85 - CR78 to CR80, Figure 23, Access Control Plan 

 

US 85 Access Control Plan Cover